A rear enclosed coop and front covered run under one continuous gable roof. Enter the run through the front gate and service the coop from the left side. This is exterior coop maintenance, not a walk-in coop.

Dimensions
Total body
6 ft × 10 ft
Rear coop / shelter · exterior
6 ft × 4 ft
Front run · exterior
6 ft × 6 ft
Assumed clear shelter base
65 in × 41 in
Care / movement
Exterior service · fixed
Flock suitability
Not verified · check conditions
6-chicken fixed coop and covered run with the run at the front and enclosed coop at the rear.
Overall form

A · Concept illustration · Existing concept image. This is not a field-build photograph or validation of the new editorial fitting assumptions.

1 of 4

Where this arrangement fits

More suitable when

A site with a left-side service approach, a front run approach and a reviewed runoff route.

Choose another direction when

A site where the left service side cannot be reached, or a keeper who needs to enter the enclosed coop.

What still needs checking

  • Keep roof discharge outside the run; cover does not prevent all side rain or ground saturation.
  • Test the service opening with the loaded waste container and the far rear corner.
  • Check the protected partition bird connection without blocking it with feed or water.

Keep total size, shelter and run separate

The existing fact card fixes the total 6 × 10 ft body, rear 6 × 4 ft coop and front 6 × 6 ft run. This new study assumes 3½ in walls for a 65 × 41 in clear coop rectangle. New fittings, opening widths and working positions are editorial reserves, not details from the historical PDF.

Total body
6 ft × 10 ft
Rear coop / shelter · exterior
6 ft × 4 ft
Front run · exterior
6 ft × 6 ft
Assumed clear shelter base
65 in × 41 in
Care / movement
Exterior service · fixed
Flock suitability
Not verified · check conditions

Clear base dimensions do not subtract fittings or establish usable bird area. Design-name flock counts are historical planning labels, not a current verified match.

Materials with a job to do

Work through these five groups before asking for prices. The worksheet leaves purchase quantities open until the design and selected products are resolved.

CR-01

Coop frame, floor and run supports

Support the enclosed and open zones without confusing their footprints.

Split the order by: Frame and supports: pieces by section/length; floor sheets: size and thickness.

What can change this choice

Do not reuse the Walk-In run post or beam schedule: it describes a different design.

Ask for these specifications

Ask for a schedule separating coop frame, floor and run supports, with their named materials, connectors and support details.

Establish the quantity

Mark the 6 × 10 ft body and the rear/front boundary, then record levels at the support positions chosen by the structural design.

Check the supplied items

Sort by assembly and mark each line against the schedule. Check member sizes and connector identities before mixing deliveries.

CR-02

Roofing and transition flashing

Cover the occupied zones and lead water past the entrance.

Split the order by: Roofing: sheets by effective cover; flashing: lengths by profile.

What can change this choice

Trace water across the coop/run transition and at the low roof edge. A covered centre can still leave a wet gate.

Ask for these specifications

Request the actual roof system’s overlap, support-spacing and fixing instructions, plus flashing profiles for the coop-to-run transition.

Establish the quantity

Establish roof geometry, receiving edges and product laps before calculating roof sheets or flashing lengths.

Check the supplied items

Check sheet lengths, effective widths, profile compatibility and transition pieces. Flag a missing flashing before closing the junction.

CR-03

Mesh, edge battens and ground closure

Complete the run boundary at corners, roof, gate and ground.

Split the order by: Mesh: rolls or panels by width/length; battens and fixings: separate lines.

What can change this choice

Compare fixing compatibility and edge protection together; net face area alone is not a roll order.

Ask for these specifications

Name aperture, wire diameter, coating, panel or roll size and the reviewed attachment and ground-edge detail. Avoid a quote labelled only “chicken wire”.

Establish the quantity

List each separate mesh face, lap and ground treatment. Include edges concealed by framing.

Check the supplied items

Compare mesh labels and dimensions with the selected specification. Check cut-edge damage, coating condition and the specified attachment components.

CR-04

Keeper gate and bird connection

Keep human access separate from movement between the rear coop and front run.

Split the order by: Keeper gate and bird opening: separate assemblies with itemized hardware.

What can change this choice

A deeper replacement surface must not stop the gate opening or reduce the bird passage.

Ask for these specifications

Request finished passage, full swing or travel, hinge and latch models, backing and threshold details for each opening.

Establish the quantity

Record finished openings, gate swing, hardware clearances and finished surface level.

Check the supplied items

Check handedness, panel dimensions and complete hardware sets against the opening schedule. Keep keeper and bird-opening parts separately labelled.

CR-05

Surface and drainage materials

Keep the entrance and removal route serviceable through rain and surface replacement.

Split the order by: Surface: loose volume or delivered mass; drainage products: separate lines.

What can change this choice

Choose the water route first. Adding absorbent material cannot resolve a continuing concentrated inflow.

Ask for these specifications

Ask for the named surface material, grading, delivery unit and quantity basis. Drainage items must follow the agreed receiving route and details.

Establish the quantity

Identify incoming roof water, incoming ground water and the lawful receiving area before calculating surface volume.

Check the supplied items

Compare the delivery ticket with the ordered material and unit. Verify the unloading location leaves the gate and daily service route usable.

Download this material worksheet · CSV See how to fill in an order line →

Resolve the design in a useful order

A design-development sequence: complete the decisions before turning the reference into construction drawings or an order.

  1. Separate the two zones

    Mark the rear coop and front run at the published outside dimensions. Add the keeper approach and bird connection.

    Before continuing: The total body is not being treated as enclosed sleeping space.

  2. Trace roof and ground water

    Use the proposed roof edges and observed ground levels to draw incoming and outgoing water paths.

    Before continuing: The keeper gate is not placed at the receiving point of concentrated runoff.

  3. Detail the complete boundary

    Work through roof-to-wall, wall-to-mesh, mesh-to-gate and mesh-to-ground transitions with the selected products.

    Before continuing: Each transition has a defined fixing, overlap, inspection route and repair method.

  4. Coordinate cleaning and replacement

    Try carrying the intended surface-removal container through the gate and to the farthest zone.

    Before continuing: The route still works with the gate open and the intended finished ground level.

Site project

Map the roof-to-ground water route

Record where water first arrives, where it collects and how the keeper reaches the gate.

  1. Draw the complete body and place the keeper gate on the sketch. Add roof edges separately from the floor outline.
  2. Mark observed incoming ground water and the proposed roof discharge. Distinguish observations from predictions.
  3. Follow each path to its receiving area. Record low points, neighbouring boundaries and the route carrying feed or bedding.
  4. Move the proposed gate approach or develop drainage details before choosing surface materials. Check the revised arrangement during the next suitable rain event.
Diagnose a muddy run →

Does cover keep the entrance usable after rain?

Draw roof discharge and the route used to carry feed before settling the position. Confirm the receiving ground and the coop connection, then review the full enclosure transition at the covered edge.

Check the whole routine at your site
TaskRehearseKeep in the record
Coop connectionTest both sides of the bird opening.Keep movement separate from the keeper’s gate.
Rain eventLocate first incoming water at the edge.Record the later wet area at the entrance.
Surface renewalCarry material from the farthest run zone.Check finished levels against gate travel.
Trace rain and ground water →

Collect → refill → inspect → remove bedding

  1. Collection and refill

    Enter at the front for F and W; use the left coop service position for nests and the rear roost zone.

  2. Full clean

    Secure birds separately; remove supplies from the run, lift out the assumed roost and bring coop bedding out through the left service opening.

  3. Recheck the result

    Restore secure fittings, continuous bird access to feed and water, clear keeper access and every enclosure closure before returning birds.

Read the fitting labels with their care tasks

  • N · Nest

    Check bird approach, egg collection and full lining removal.

    Explore n · nest
  • Roost

    Lift-out is an editorial assumption; supports and secure refitting need review.

    Explore roost
  • F · Feed

    Reserve refill access without obstructing the gate or bird connection.

    Explore f · feed
  • W · Water

    Check spills and continuous bird access after every reset.

    Explore w · water
  • Bedding and base

    The supporting floor and replaceable material remain separate decisions.

    Explore bedding and base
  • Protected air

    Opening placement is a relationship, not a calculated ventilation rate.

    Explore protected air

Compare the operation in the same shell

A · Feed and water near the front gate

D · D02 A / everydayZones scaled to total 6 ft × 10 ftNRFWBird linkRun accessStand at sideN nest · F feed · W water · amber keeper approachFittings and openings are editorial reserves, not measured parts.Editorial study · check assumptions on the page
Feed and water near the front gate

Same-shell operation study · covered-run-editorial-4.2.0

Everyday: Enter at the front for F and W; use the left coop service position for nests and the rear roost zone.

Full clean: Secure birds separately; remove supplies from the run, lift out the assumed roost and bring coop bedding out through the left service opening.

Trade-off: Short refill approach, but equipment near the gate must leave a clear entrance.

B · Supplies farther along the run

D · D02 B / everydayZones scaled to total 6 ft × 10 ftNRFWBird linkRun accessStand at sideN nest · F feed · W water · amber keeper approachFittings and openings are editorial reserves, not measured parts.Editorial study · check assumptions on the page
Supplies farther along the run

Same-shell operation study · covered-run-editorial-4.2.0

Everyday: Carry supplies beyond the gate to the side reserves; egg collection still uses the left coop service position.

Full clean: Clear the longer run route before removing waste; do not push equipment into the partition bird connection.

Trade-off: More room near the gate, with a longer carry and more side-reach checking.

Keep the design and decisions together

A six-page companion: current layout, two pages of material specifications and worksheet guidance, a practical project, the preparation sequence and a worked decision example.

In this design

  • Separate coop and run dimensions
  • Two care arrangements
  • Rain-route and material worksheet

Still to resolve

  • Coordinated framing and roof joints
  • Final enclosure and ground details
  • Quantity-led BOM and member cuts

The 6 × 10 ft outside reference contains a rear 6 × 4 ft coop and front 6 × 6 ft run. Wall allowances and internal fittings are editorial assumptions. Roof connections, framing and purchase quantities are not construction-resolved by this workbook.

PDF · v1.2.0 · 6 pages · 196 KB

Download Coop with Covered Run design workbook PDF
Material worksheet · CSV ↓

Turn the worksheet into a usable request

Use the PDF to understand the design; use the CSV to record products and quantities. A completed description is a request for review, not automatic approval to order.

  1. Split a group into order lines. The five groups organize the work. Copy a group into separate product rows when sizes, models or purchase units differ; keep its Scope ID on every copied row.
  2. Keep quantities traceable. Enter quantity and unit together, with the measured sketch or drawing revision and quote reference. Leave an unknown quantity blank and set its review status to Pending details; blank is not zero.
  3. Reconcile before ordering. Name the exact product and record unresolved substitutions or excluded parts. Record who checked the line and when. Update affected quantities whenever the drawing or product changes.

When the supplied items differ from the agreed specification, record the discrepancy against its Scope ID and resolve it before using them in the assembly. Receipt checks do not establish structural or handling performance.

Companion 1.2.0 · 2026-10-12 · Drawing basis: covered-run-editorial-4.2.0. Historical Design Sheets remain separate references.

Earlier reference and layout summary

The existing Design Sheet below remains unchanged at version 3.2.0. It does not contain or validate this new editorial layout study.

PDF · v3.2.0 · 12 pages · 3.2 MB

Download Coop with Covered Run historical Design Sheet PDF
More resources · existing preparation and site-fit tools

Prepare a site-specific work scope

Bring support, anchoring, opening, weather and enclosure questions to local review. A reference study does not supply final construction approval.

Use this plan in three moves

What you can take away today.

Start with a measured footprint check, work through the five decisions below, then carry the unresolved parts into a local review. The 12-page Design Sheet v3.2.0 and your browser-only record use the same question structure.

  1. 01

    Measure the fit

    Enter one candidate yard rectangle below and test the published footprint in both orientations.

  2. 02

    Resolve five questions

    Check flock, site, routine, weather and budget against the supporting Design Sheet pages.

  3. 03

    Carry unknowns forward

    Save observations and open questions in a browser-only record for local review.

Measured yard fit · rectangle check

Put the Plan inside a space you measured.

Enter the usable rectangle left after any locally required setbacks or routes you already know about. The result checks two orientations and keeps everything else visible.

FT
FT

Measure one candidate rectangle. Enter decimal feet or field notation such as 10' 6"; the worksheet converts inches for you.

Current readout

Enter both measurements to compare at scale.

1 selected Plan. Positive remaining lengths are unassigned space, not recommended clearance.

6-Chicken Coop + Covered Run footprint awaiting a measured candidate areaThe Plan envelope is shown without a site rectangle because both candidate-area dimensions have not been entered.PLAN ENVELOPE6 × 10 FTENTER BOTH SITE DIMENSIONS TO DRAW AT THE SAME SCALE
Waiting for measurements6 × 10 ft overall coop + covered-run envelope

6-Chicken Coop + Covered Run

Candidate area not measured.

Still measure or confirm

  • Reserve usable approach to the front run gate and left-side coop service door; this arithmetic does not assign that access.
  • Roof runoff, surface water and local setbacks remain outside this rectangle check.

Plan result to record6-Chicken Coop + Covered Run

Checking this browser for saved measurements…

Keeper-entered measurements · browser-only storage. “Fits” describes the two rectangles only. Confirm access, outdoor area, drainage, utilities, local rules and any structural work separately.

Step 02 · Make the plan yours

Five questions to carry from the Design Sheet to your record

You do not need every answer today. Record what you have observed, keep unknowns explicit, and use each page link to see the relevant reference.

  1. FLOCKSeparate the two usable zones

    The 6 × 10 ft overall reference includes a rear 6 × 4 ft enclosed coop and front 6 × 6 ft covered run. What birds and periods of confinement must each zone serve?

    Keeper: record actual birds and outdoor use. Local Extension: discuss housing conditions that remain unclear.

  2. SITEKeep both service routes usable

    Record approach space for the front run gate and the left-side coop service door, plus where roof and surface water go in rain.

    Keeper: observe the site safely. Local authority: confirm use and setbacks. A suitable site professional: assess drainage or support changes.

  3. ROUTINETest the gate-to-refill routine

    Feed and water belong near usable run access without blocking the shared pop opening. Can you refill, collect eggs and remove bedding through the separate care routes?

    Keeper: walk the care route and record reach, cleaning and access conflicts; an experienced keeper or local Extension can help review the routine.

  4. WEATHERA roof does not settle exposure

    The continuous gable covers both zones. Which sides still receive wind-driven rain? What roof, mesh, latch, ventilation and runoff questions need review?

    Keeper: record exposure and openings. A qualified local professional: review proposed roof, support or anchoring changes; an electrician handles electrical work.

  5. BUDGETPrice the connected system

    Include the continuous weather layer, mesh, both access points, support, site work and recurring care. Which items lack scope, a quote or an accountable reviewer?

    Keeper: list all scope and unknowns. Suppliers: provide dated quotes. Appropriate local professionals: define any site-specific design or service work.

Step 03 · Keep the evidence with the decision

Turn the five answers into your review record.

Your notes stay in this browser. Use the record to separate what you know, what remains unknown and who needs to review it next.

Prefer paper? Use PDF p. 8 for site / routine notes and p. 9 for local-review questions. The matching FLOCK–BUDGET question sheets start on p. 11. If your PDF viewer ignores the link, turn to the numbered page.

Basis and review

2026-10-02 · covered-run-editorial-4.2.0. Outside form and known zone relationships follow the existing plan fact card. Added assumptions are identified in the layout section. No field-built case, handling test or expert approval is claimed.

Did this help you choose or solve the problem?

Choose what was missing, then confirm to send this fixed reason.

Send details or keep a correction draft